END-TO-END SOLUTION [MINING]

PROJECT-MINING
 
2MVA Power Station
4 x 500Kva in Parallel Sync with Modbus TCP Scada override for additional controls
1 x 20ft 415V distribution container with harmonic distortion filtration
1 x 60,000L diesel tank & fuel control system pumping into a 4000L day tank.
All designed / supplied and installed by DGA.

 

 