Load bank testing – Tas Water
850 Kva Backup generator using two 500kva load bank in parallel 12-month annual load testing All designed / supplied and installed by DGA.
850 Kva Backup generator using two 500kva load bank in parallel 12-month annual load testing All designed / supplied and installed by DGA.
Vandal proof covers Remote monitoring & control Custom build tank & fuel system Air lifted into position All designed / supplied and installed by DGA.
2MVA Power Station 4 x 500Kva in Parallel Sync with Modbus TCP Scada override for additional controls1 x 20ft 415V distribution container with harmonic distortion filtration1 x 60,000L diesel tank & fuel control system pumping into a 4000L day tank.All designed / supplied and installed by DGA.
48V UPS battery backup 48V Backup generator 1000L fuel cell Installed & commissioned by DGA.
1MVA Generator 1MVA 22KV Transformer 1 x 500kva resistive load bank 1 x 22,000L fuel system All designed / supplied and installed by DGA.
1 x 850kva CAT 1 x 250-meter fuel system with two pump cabinets Fuel system is design with overfill prevention and fuel schedule cycling system. All designed / supplied and installed by DGA.
1 x Custom build & installed unit C90 Cummins 1 x Pad mounted C110 All designed / supplied and installed by DGA.